Bunker Survey — Tank Calculation

G.O.V., V.C.F. (ASTM 54B), G.S.V., W.C.F. (ASTM 56) and quantity for one tank reading.

Input

Trim (aft − fwd): —
Optional: density override

Result

G.O.V.—m³
V.C.F.—
G.S.V.—m³
W.C.F.—
Quantity—MT
Working
Density used (t/m³)—
Rounded density (kg/m³)—
Temperature (°F)—
Alpha—
Pipe length (mm)—
Sounding (mm)—
Table levels (mm)—
Volume at levels (m³)—
Interpolated volume (m³)—
Trim used / nodes (m)—
Corrections at nodes (m³)—
Trim correction (m³)—
Table volume (m³)—
% full—